Files
accounted/lib
Jakob Wennberg e4186523f9 feat(api): v1 invoice :mark-sent action verb (Phase 2 PR-B-2b-1) (#454)
* feat(api): v1 invoice :mark-sent action verb (Phase 2 PR-B-2b-1)

First invoice action verb. Transitions a DRAFT invoice to 'sent' status —
intended for invoices delivered outside gnubok (Peppol, postal, custom
SMTP). The full :send pipeline (PDF + email) builds on top of this in
PR-B-2b-3.

URL convention: plain /verb subpath (e.g. /invoices/:id/mark-sent), not
the AIP-style :verb suffix the plan originally proposed. Next.js routes
don't support `:` in folder names, and the Stripe/QuickBooks idiom is
plain subpaths anyway. The agent-facing docs can still describe the
action however we want.

What happens on commit:
1. F-series invoice_number allocated atomically via the
   generate_invoice_number RPC (per the PR-B-2a design — drafts have
   invoice_number=null until this transition, preserving the unbroken
   löpnummer series required by ML 17 kap 24§ p.2).
2. Status flips draft → sent.
3. For accrual + real invoices, posts the invoice journal entry via
   createInvoiceJournalEntry (Debit AR 1510 / Credit revenue 3xxx /
   Credit output VAT 26xx). Cash basis skips this; booking happens at
   payment time.
4. Writes journal_entry_id back onto the invoice row.
5. Emits invoice.sent.

Race-condition guard: the status update matches .eq('status', 'draft'),
so a concurrent transition between pre-flight and update returns 409
INVOICE_UPDATE_NOT_DRAFT.

Dry-run: returns a preview of the post-send invoice state including a
would_create_journal_entry flag and the resolved accounting_method.
invoice_number can't be predicted exactly (atomic sequence allocation)
so the preview shows a marker rather than a fake number.

PDF archival is deliberately NOT in this PR. The internal route does
it, but PDF rendering + document upload is a meaningful surface area
that belongs with :send (PR-B-2b-3) where email + PDF land together.

Test infrastructure: the makeFlexibleSupabase mock now supports
per-table result QUEUES (array form returns results in order across
multiple calls; single value returns same result every time). Required
to mock the pre-flight read (status=draft) and post-update read
(status=sent) on the same `invoices` table inside one request.

9 new tests covering happy path, idempotency, scope, draft-only guard,
delivery-note rejection, 404, UUID validation, dry-run preview shape,
and cash-method skip. 3174/3174 vitest pass; build clean.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>

* fix(api): address PR #454 review (Greptile + swarm + Swedish compliance)

Real bugs / contract violations:

- Greptile P1 (guard order): the delivery_note guard ran AFTER the
  status check, so a sent delivery note returned 409 instead of the
  documented 400. Reordered: document-shape guards (delivery_note +
  credit_note + missing moms_ruta) now run before the status check.
- Greptile P1 (journal_entry_id write-back): Supabase returns
  { data, error } and never rejects on DB errors, so a write-back
  failure produced no log and left the invoice with a real journal
  entry but no pointer. Now destructured + escalated to error log AND
  surfaced as a warning in the response.
- Swedish: credit notes (credited_invoice_id !== null) were not
  rejected — they would have been posted via createInvoiceJournalEntry
  with the wrong sign (Debit AR / Credit revenue instead of the
  inverse). Now explicitly rejected; credit-note path goes through
  POST /:id/credit (PR-B-2b-4).
- Swedish: moms_ruta now validated in the pre-flight. A null value
  would silently default to 25% domestic in the journal-entry
  generator — wrong for reverse-charge / EU-service / zero-rated
  invoices. Real ML 17 kap 24§ concern.

Partial-state visibility (Swedish + Swarm V2.3 + A.8.15 + PI1.3):

The response now carries an optional `warnings: [{ code, message }]`
field when the status flip succeeded but a follow-up step failed
(journal entry creation, event emission, or journal_entry_id write-
back). Three warning codes:
  - JOURNAL_ENTRY_NOT_POSTED — verifikation missing; BFL 5 kap
    reconciliation required
  - JOURNAL_ENTRY_ID_WRITEBACK_FAILED — entry exists but invoice row
    has no pointer
  - EVENT_EMIT_FAILED — webhook subscribers may miss this transition
All three escalate to error-level logs. The architectural fix
(transactional Postgres RPC that bundles allocation + status flip
+ journal entry) is tracked as cross-surface compliance work; the
warnings field is the agent-facing signal until that lands.

The F-series race window (number allocated before status flip; a
concurrent transition can leave a consumed-but-orphaned number, ML
17 kap 24§ p.2 gap) is now explicitly documented in the route
docstring rather than hidden in implementation. Same residual issue
exists in the internal route; fix needs the transactional RPC.

Pushing back (consistent with prior triage):
- V8.2.1 explicit ownership check (wrapper handles — false positive)
- Cross-tenant IDOR test (duplicates wrapper test coverage)
- Pseudonymise IDs in logs (operational value > theoretical risk)
- Structured audit event sink (current ctx.log.info IS structured)
- Test fixture A.8.33 (NODE_ENV guard in place; Acme AB is canonical
  synthetic placeholder)
- Projection column narrowing (fields ARE used in the flow)
- company_settings hard-fail on miss (accrual default is normal)

3 new tests covering credit-note rejection, missing moms_ruta, and
the journal-entry-failed warnings path. Plus the delivery-note test
now asserts the guard ordering works for sent delivery notes too.
3177/3177 vitest pass; build clean.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>

---------

Co-authored-by: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-12 23:19:21 +02:00
..
2026-05-06 11:12:02 +02:00
2026-03-21 00:47:54 +01:00
2026-05-05 09:53:37 +02:00
2026-05-06 14:08:38 +02:00
2026-02-24 16:06:36 +01:00
2026-05-05 09:53:37 +02:00
2026-04-29 16:32:26 +02:00
2026-05-11 17:12:00 +02:00
2026-05-06 11:12:02 +02:00
2026-05-06 11:12:02 +02:00
2026-04-22 18:14:01 +02:00
2026-05-12 01:10:01 +02:00
2026-05-11 00:27:44 +02:00
2026-05-06 11:12:02 +02:00
2026-05-12 18:04:48 +02:00
2026-05-12 18:04:48 +02:00
2026-04-15 11:17:39 +02:00
2026-05-05 09:53:37 +02:00
2026-05-06 11:12:02 +02:00
2026-05-08 15:42:06 +02:00
2026-04-29 16:32:26 +02:00