e35714518f
Feedback seq 249297: run_year_end on Räkenskapsår 2024/2025 seeded the closing balances into an existing 2026/2027 period and left no period at all for 2025/2026. Root cause: SIE import wires previous_period_id to the NEAREST later period regardless of gap (the company had an onboarding-seeded 2026/2027 when 2024/2025 was imported), and findNextPeriod trusted the chain unchecked. - findNextPeriod: a chained period is only the next period when it starts the day after the current one; otherwise log and fall through to the date lookup so year-end creates the contiguous period. - createNextPeriod: relink a successor that was chained across the gap onto the newly created period, healing the chain. - SIE import: wire predecessor and successor links only when date-adjacent. A gap stays unlinked until the missing year exists. Prod scan 2026-08-24: 40 non-adjacent links across 39 companies (mostly an old historical year chained to an onboarding-seeded current year). The read-side guard neutralizes all of them for year-end; the data repair is a separate, founder-approved step. The reporting company (23dc3c97) self-repaired the same evening via the fiscal-periods gap-fill route; the stray IB entry is reversed. Claude-Session: https://claude.ai/code/session_01ScVhg6XsDtNXkiEQNV7LaZ Co-authored-by: Jakob Wennberg <311770904+jakobwennberg-oss@users.noreply.github.com> Co-authored-by: Claude Fable 5 <noreply@anthropic.com>