Files
accounted/app/api/reports
Mattsson 85e039035d feat(reports): custom date ranges on report endpoints in REST v1 and MCP, plus PDF export via API (#1909)
* feat(reports): custom date ranges on report endpoints in REST v1 and MCP, plus PDF export via API

Requested by a v1/MCP user: the web UI can produce resultat- and
balansrapport for a custom period with PDF export, but REST v1 and the
MCP tools only served whole fiscal years and silently ignored
from_date/to_date.

- v1 income-statement: optional from_date/to_date (validated against the
  fiscal period via the same parseReportDateRange the dashboard uses)
- v1 balance-sheet: same, plus as_of as the natural alias for to_date
  (mutually exclusive with it)
- Unknown query params on these report routes now return
  VALIDATION_ERROR with the unknown and allowed names instead of being
  silently dropped (scoped to these routes, not a global v1 change)
- MCP gnubok_get_income_statement: from_date/to_date;
  gnubok_get_balance_sheet: as_of_date; both validate format, in-period
  and ordering, and reject unknown args (tools/list payload bench held
  under the ceiling by trimming the same tools' descriptions)
- New v1 PDF endpoints reports/{income-statement,balance-sheet}/pdf,
  byte-equivalent to the dashboard export: the K2/K3 grouping and the
  balance gate moved to lib/reports/financial-statement-pdf.ts, shared
  by both surfaces
- Both JSON endpoints echo the effective range in data.period

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>

* fix(reports): range semantics, empty-date validation, and review findings on PR #1909

Consolidated resolution of the skeptic refutations, CI failures, and
CodeRabbit findings:

- Ranged income statement summed closing balances, so from_date after
  period start returned year-to-date figures mislabeled as the range
  (July revenue reported as Jan-Jul on JSON, PDF, and MCP). The trial
  balance rolls pre-range P&L activity into opening columns, so
  generateIncomeStatement now builds from period movements whenever
  fromDate is set, matching the resultatrapport convention. Full-period
  behavior is unchanged; generator-level regression tests added.
- from_date dropped from the v1 balance-sheet routes (JSON + PDF): a
  balansraking is a cumulative position, not a flow over a window
  (ÅRL 3 kap); matches the MCP tool's as_of_date-only surface.
- Empty date values (from_date=) now fail validation instead of
  silently producing a full-period report with an empty period echo
  (null-check instead of truthiness in parseReportDateRange).
- dry_run, read by the withApiV1 wrapper on every request, is tolerated
  by the strict param check instead of being rejected as unknown.
- Unbalanced balansrakning on the v1 PDF route returns 400 (caller-data
  condition), matching the dashboard export, instead of 500.
- skills/accounted-api regenerated (apiskill:check gate).
- Removed the ISO_DATE_RE import that collided with the pre-existing
  local declaration in the MCP server (TS2440 on core build).
- CodeRabbit: 401 tests for both PDF endpoints; event bus cleared in
  the new MCP test's beforeEach.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>

---------

Co-authored-by: Claude Fable 5 <noreply@anthropic.com>
2026-08-25 20:34:21 +02:00
..
2026-07-21 23:00:15 +02:00
2026-07-21 23:00:15 +02:00
2026-07-28 19:50:16 +02:00
2026-07-21 23:00:15 +02:00
2026-07-21 23:00:15 +02:00
2026-07-21 23:00:15 +02:00
2026-07-21 23:00:15 +02:00
2026-07-28 19:50:16 +02:00
2026-07-21 23:00:15 +02:00