Commit Graph
3 Commits
Author SHA1 Message Date
MattssonandClaude Fable 5 f75ea2384d feat(calendar): enable calendar sync for Viktiga datum (#1853)
Turns on the calendar extension (built Feb 2026, stripped in the 2026-03-02 production readiness deploy, never re-enabled): ICS feed settings, calendar workspace, subscribe button on the Viktiga datum page.

Hardening before first real use: feed serve route now requires the creator to still be a company member (offboarding stops the feed); stable pagination (due_date + id, dedupe) on feed queries; fetches inside the logged try block; invoice events limited to sent/paid/partially_paid/overdue; event UIDs rebranded to accounted.se while zero feeds exist; APP_URL fallback fails closed in production; mobile stacking for the deadlines header; settings note that Google Calendar needs default notifications on subscribed calendars; calendar workspace aligned with the design system.

Skeptic reviewed (3 refutations, all fixed) plus one compliance swarm finding (fixed). No migrations.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-08-24 16:32:44 +02:00
Jakob WennbergandClaude Opus 4.6 091d043c85 feat: UI polish, lint fixes, onboarding redesign, help page expansion, and test improvements
Broad update across dashboard pages, components, extensions, and lib code. Includes ESLint config additions, onboarding flow redesign, settings page refactor, help page content expansion, dead code removal, and test mock fixes. Adds dev docs and public assets.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-05 23:05:49 +01:00
Jakob Wennberg 6cef4e11eb New classification logic etc 2026-02-24 11:33:22 +01:00