Commit Graph
5 Commits
Author SHA1 Message Date
siax-bot 680fa7ee6b fix(ci): repair baseline typecheck and pnpm supply-chain config
CI (SIAX Cloud) / sonar (pull_request) Skipped
CI (SIAX Cloud) / Component conformance (blocking) (pull_request) Successful in 13s
CI (SIAX Cloud) / security (pull_request) Successful in 25s
masterplan-lock / check (pull_request) Successful in 8s
security / scan (pull_request) Failing after 51s
CI (SIAX Cloud) / integration (pull_request) Successful in 3m33s
CI (SIAX Cloud) / quality (pull_request) Successful in 4m30s
- pnpm-workspace.yaml: blockExoticSubdeps, minimumReleaseAge=10080,
  trustPolicy=no-downgrade (Semgrep p/ci blocking rules)
- src/auth/{internal-service-tenant,internal-token}.ts: type-only view of
  process.env for narrow named-property defaults (@types/node 22 ProcessEnv)
- tests: typed mutable env view for NODE_ENV save/restore (readonly in
  @types/node 22). No auth check weakened, no runtime behaviour changed.

Verification: pnpm run typecheck EXIT 0 (was 8 errors); vitest 30/30 PASS.
2026-11-17 21:17:32 +01:00
admin 3d2fc6f913 fix(recovery): restore source removed by production documentation merge 2026-11-10 03:42:10 +01:00
admin a4189333af docs(production): standardiserad produktionsberedskap och gap-analys
Lägger docs/production-readiness.md och siax/production-gaps.json enligt SIAX Master Definition of Done. Underlag: git-, kod- och live-evidens 2026-11-11. Nivån är evidensbaserad, inte ett leveransgodkännande.
2026-11-10 03:07:36 +01:00
SIAX Foundation Bot 844220d9f5 feat(foundation): Wave 3 integrity/persistence/build fixes
CI (SIAX Cloud) / security (push) Failing after 28s
CI (SIAX Cloud) / quality (push) Failing after 38s
2026-07-25 13:54:36 +02:00
adminandClaude Opus 4.8 24035dec8b Build 0pt ordering flow: configurator, deposit/escrow, production tracker, validation
Customer order lifecycle on the mono design system: red + provenance tokens, useReveal hook, lib/data pricing model, ProvenanceBadge/CellProvenance, OrderStepper, and 4 routes with live pricing, 50/50 escrow, simulated production, 4-view validation. tsc clean; next build green (5 routes).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-24 17:28:24 +02:00